CORPORATE

Elazığ / Turkiye

Workforce Housing Complex: Elazığ Health Campus

DMT Modular successfully completed a massive 3,614 m² prefabricated living complex in 2017 for the workforce of the Elazığ Health Campus project. Designed as 3-storey dormitories, the facility was engineered to provide safe, modern, and comfortable living environments. By integrating bedrooms with social and common areas, this project reflects DMT Modular's capability to offer fast, high-capacity, and human-centric solutions for large-scale construction mobilization.

Workforce Housing Complex: Elazığ Health Campus
Project Details
  • Location: Elazığ / Turkiye
  • Program: Workforce Accommodation & Social Complex
  • Scope: Design, production, and installation of multi-story modular units
  • Total Area: 3,614 m²
  • Structure: 3-Storey Prefabricated Steel Modular System
  • Focus: Rapid mobilization, structural durability, and worker welfare
Comprehensive Living Spaces for Large Workforces
The facility was planned to go beyond basic shelter, creating a functional "home away from home" for construction teams. The unique 3-storey layout seamlessly integrates sleeping quarters with essential social zones and common areas. This holistic design approach ensures a comfortable environment that supports workforce well-being and productivity throughout the duration of the main construction project.
High-Capacity 3-Storey Modular Engineering
Utilizing advanced pre-engineered steel technology, DMT Modular successfully delivered a multi-story solution rarely seen in temporary facilities. The 3-storey design maximizes land efficiency while maintaining robust structural integrity. Built to withstand harsh site conditions, these modules offer superior durability and safety compared to standard container solutions, proving the versatility of our engineering.
Rapid Mobilization for Mega Projects
Time is the most critical asset in large-scale infrastructure projects. By manufacturing all units in our controlled factory environment, we ensured consistent quality and rapid deployment to the Elazığ site. This efficient off-site construction process allowed for the immediate mobilization of the workforce, eliminating delays and accelerating the start of the massive Health Campus construction.
Need more details?

To get more information, please share your contact details with us, and we will get back to you within 48 hours.

Follow us
on Social Media

Follow our Instagram and LinkedIn pages for updates, news, events, and more.